Future Plans

Tasks Planned for 2007:

  • Install trunk weather stripping
  • Door pins
  • Price out/find Bowden cable for temp control
  • Change transmission filter
  • Coolant flush
  • Install tranny cooler
  • Change drivers headlight
  • Fix visors
  • Get speedometer gear corrected
  • Fix rear diff leak
  • Body work-patching:
    1) below rear window
    2) corner of rear window
    3) roof pass door
    4) rear quarters
    5) paint chip pass side front hood corner
    Tasks Completed in 2006:
  • Reupholstering Front & Back seats
  • Replace interior carpet
  • Installed Lakewood Driveshaft Loops
  • Installed longer/larger wheel studs on Rear Axles to accomandate using Slicks
    Tasks Completed in 2005:
  • Installed Air Gap Intake
  • Installed Holley Carb
  • Added AutoMeter Electric Temp Gauge
  • Added AutoMeter Electric Oil Pressure Gauge
  • Added Vacuum Gauge
  • Changed Temp ground
  • Verified Engine temp on gauge with digital meter
  • Relocated Temperature Sender Unit
  • Removed A/C Condenser
  • Replaced Hood Lamp
  • Replaced Heater Core
  • Trunk liner
  • Fixed drivers taillight ground